Skip to main content

Upper Peninsula Regional Digitization Center

You've searched: All Collections

  • All fields: voids
(4 results)



Display: 20

    • Grouting

    • Mackinac Bridge (Mich) ; Bridges -- Design and construction
    • Here the grout plant is moored to one of the cable anchor piers. The grout is pumped through the grout tubes into the voids between the limestone aggregate and raises to the surface forcing the water up and out. (1)
    • Grouting

    • Mackinac Bridge (Mich) ; Bridges -- Design and construction
    • Here the grout plant is moored to one of the cable anchor piers. The grout is pumped through the grout tubes into the voids between the limestone aggregate and raises to the surface forcing the water up and out. (2)
    • Grouting

    • Mackinac Bridge (Mich) ; Bridges -- Design and construction
    • Grout was pumped down the grout pipes to the bottom of the aggregate layer. As the grout raised through the voids between the aggregate it displaced the water that was above it. Before the grout ""set"" the pipes were pulled up to a prescribed...

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK